2020 ACCOMPLISHMENT

PGOM – GSO Accomplishments

PGOM – General Services Office Accomplishments

• Facilitated the Land Titling of PGOM Land Assets

A total of six (6) land parcels acquired during previous administrations were successfully titled under the Provincial Government. These are located in Mamburao, Sta. Cruz, Sablayan, and San Jose, with a combined land area of 40.8812 hectares.

• Facilitated the Registration / Renewal of PGOM Fixed Assets and Vehicles

In compliance with the Insurance Code of the Philippines, thirteen (13) fixed assets were registered or renewed. Additionally, seventy-three (73) vehicles—including motorcycles, motor vehicles, and heavy equipment—were registered or renewed during the year.

• Conducted Inventories

A Physical Inventory of Properties was conducted in October 2020. The status of the properties was determined, except for those in Lubang Island Offices. Re-issuance of Memorandum Receipts was also carried out for proper documentation and accountability.

A partial inventory of infrastructure projects (2003–2019) in SAMARICA areas was also completed, recording a total of 137 infrastructures.

• Conduct of Public Bidding

The following procurement activities were conducted in 2020:

  • 49 infrastructure projects
  • 125 procurements for goods
  • 972 Request for Quotations (RFQs) posted on PhilGEPS
  • 907 RFQs for procurements below ₱50,000
  • 2,048 BAC Resolutions prepared and approved
• Provided General Services to All PGOM Offices

General services, including repair and maintenance of facilities, were provided to various PGOM offices.

Additional Repairs, Installations, and Services
  • Repair of electric lines and replacement of transformer damaged by Typhoon Quinta on October 26, 2019
  • Repair of PEPO Parking Area damaged by Typhoon Tisoy in December 2019
  • Repair of Capitol Main Building, Training Center, and Powerhouse Flashing, Fascia Board, and replacement of Capitol Canteen canopy roofing damaged by typhoons
  • Repair of OPA/PVET Office space for PGO Extension Offices
  • Repair of former PVET Building to serve as PWD Office
  • Repair and varnishing of the Provincial Governor’s Office wood tile
  • Installation of glass panel/cubicle and air conditioning unit in the Office of the Provincial Administrator
  • Installation of glass cubicle at ENR Office
  • Fabrication/installation of steel and glass windows at Cashiers Division (PTO)
  • Maintenance and supervision of landscaping and related services
Requests Acted Upon
Particulars Number of Requests
SAI Status provided 1,713
RIS issued 151
No. of PRs reviewed 1,008
No. of PO’s attachments checked and verified 1,008
No. of Requests for Inspection conducted 1,018